Exterior Before
Before the installation
Interior Piping
We were able to conceal the horizontal runs of piping above the basement drop ceilings.
Interior in Progress
This was one of the basement floor penetrations.
Trent at Work
Trent is working on the suction pit below the slab.
Zach at work
Zach navigating the basement with schedule 40 PVC
Interior Complete #1
One of the two vertical sections of interior piping.
Interior Complete #2
The second vertical section from the additional suction point.
Completed Exterior
The exterior section was completed with a fan cover and a soffit penetration. This is something we offer to help the system blend in.